Networld là thành viên chính thức của Hội Đồng Công Trình Xanh Việt Nam Networld là thành viên chính thức của Hội Đồng Công Trình Xanh Hoa Kỳ
Vietnamese English
 
ABB
Allianz
British Army
BOEING
BROADWING
CALLAWAY
CAPE FEAR MUSEUM
CHANGI
COMPUWARE
GSA
ICESHEFFIELD
KORER POST
LAS VEGAS
MILTON HERSHEY SCHOOL
MONTANA State University
PHILIPS
PUTRAJAYA
ROBBINSDALE
ROCHE
FOUR POINTS
The 21st Century Tower
University of Teesside
Whirlpool
 
CALLAWAY
Callaway gains flexibility, improved response time with Vykon Energy
  • 14,000 acre resort includes 800 guest rooms, more than 96,000 sq. ft. of meeting space, 36 holes of golf, and many garden attractions.
  • On-site utilities including water treatment plant, chiller plant, sewage treatment plant, and backup power generation.
  • 24-hour monitoring center.
Callaway requirements
  • Better management of its facilities including temperatures, fire, lighting, humidity, and energy.
  • Major reductions in energy and labor expenses.
  • More immediate and efficient response to unfavorable conditions.
 Vykon Provided
  • Integration of existing building automation systems to extend their life and enhance their functionality.
  • Real-time control and monitoring to provide alarms through a browser and the ability to change system configuration accordingly.
  • Control logic between unique systems that make system changes without manual intervention.
Benefits to Callaway
  • Automated electrical demand limiting has saved over half a million dollars.
  • Drastically reduced cost of maintenance.
  • Improved response time for engineering staff.

:: Trang chủ:: Giới thiệu:: Dịch vụ:: Công nghệ LED:: Smart Film:: Sản phẩm:: Dự án:: Case Studies:: Tin tức:: Clip:: Liên hệ::
©2008 All right reserved. Networld-ic.com.   NW Login